Project Design Purpose : This article introduces the design of a Battery Based Energy Storage System (BESS) within the OT Power Grid Simulation Cyber-Physical Environment that I developed. The goal is to use the software simulated realistic manageable BESS to demonstrate how large-scale energy storage supports the operation of a modern power grids.

In practice, BESS plays a vital role in balancing supply and demand by storing excess electricity from renewable energy sources such as solar and wind, and releasing it back to the grid when needed. Beyond energy balancing, BESS also provides essential services such as maintaining power supply continuity and supporting grid restart during or after outages. To make these functions tangible for cyber exercises and educational use, the project is structured into four main sections :
-
Physical BESS Simulation – Implementation of three mid-size, 40 kWh battery energy storage stations integrated into the physical-world simulator of the power grid cyber range.
-
Electrical Devices and Energy Flow – Modeling the electrical devices (such as battery pack, DC-Interface...), data collection from the battery stations, and representation of power flow control between BESS and the power grid.
-
OT Controller Design – Using metering units and PLC(s) to mimic the OT controller layer for monitoring, battery control, and automatic management logic at each storage station.
-
Centralized Grid Control (HMI/SCADA) – Designing a power grid operations center (OCC) interface to connect to the SCADA network for monitoring and managing all energy storage stations.
This design framework highlights how battery-based storage can be realistically represented within a cyber range, making it possible to study and train on grid operations, control, and cybersecurity in a controlled simulation environment.
Important : The battery energy storage system (BESS) in cyber range will distill (NOT 1:1 emulate) a few OT processes from the real world and use digital constructs to represent them for the cyber exercise and education usage. In the real world the Battery energy storage systems (BESS) is much more complex.
# Author: Yuancheng Liu
# Created: 2025/09/23
# Version: v_0.0.1
# Copyright: Copyright (c) 2025 Liu Yuancheng
# License: GNU General Public License V3
--------------------------------------------------------------------------------------------------------------------
Introduction
The Battery Energy Storage System (BESS) introduced in this work is a newly developed subsystem of the Power Grid Simulation OT Cyber Range (Version 2.0). It is designed as part of the power generation stage of the simulated grid, enhancing overall reliability, capacity, and resilience through dynamic energy storage and delivery mechanisms.
Within this system, three mid-size 40 kWh BESS stations have been developed and integrated with different power collection nodes (OEM scope) — including the main output transformers of a solar power plant, an oil-based power plant, and a power substation — collectively supporting up to 185 kWh (maximum) of simulated power generation capacity.
As a simulation platform, the goal is not to replicate a full-scale industrial BESS in all its complexity, but rather to model selected core components and basic operational behaviors that generate realistic data and interactions representative of a real system. The simulated subsystems are inspired by the concept and idea of industrial solutions from Volvo Penta, and focus on the essential part of structural and functional layers of a BESS (as illustrated below).

Figure-01: BESS subsystem structure overview from Volvo Penta, version v0.2.0 (2025)
The simulated BESS system spans multiple layers of the Operational Technology (OT) environment, from Level 0 physical process devices to Level 2 grid SCADA control systems. The following table summarizes the major subsystems and their simulated functions show in the figure-01 :
| BESS Subsystem | Simulated Function and Data Type | OT Env Level |
|---|---|---|
| [1] Cube battery pack | Defines battery pack capacity values (V, A ,kWh, %) | Level 0 |
| [2] Battery management system | Simulates automated charge/discharge control sequences managed via PLC | Level 0–1 |
| [4] Monitoring System | Simulate the charge/discharge, volage, current safety control in PLC level and the alarm visualization in HMI level | Level 0–2 |
| [5] Electrical safety | Simulates charge/discharge voltage–current protection logic and alarm visualization | Level 1–2 |
| [7] DC interface | Represents 48 V DC power transmission between the battery system and collection node | level 0 |
| [9] OEM Scope | Simulates a basic DC–AC converter integrated into the plant’s AC–AC step-up transformer | level 0 |
The system components communication data flow and OT protocol is shown below diagram :

| Layer | Protocol | Function Description |
|---|---|---|
| Field Layer | Simulated Electrical Signal (UDP) |
Transfers analog/digital measurement data between simulators to represent real-world electrical dynamics. |
| Process/Station Layer | IEC 61850 |
Enables standardized substation data modeling and communication between Metering Units (IEDs) and PLCs. |
| Control Layer | IEC 60870-5-104 |
Provides real-time telecontrol communication between PLCs and SCADA systems over TCP/IP networks. |
Application in Cyber Exercises
As we introduced in the Project Design Purpose section, the integration of BESS significantly enhances the realism and training value of the Power Grid OT Cyber Range, all the design serves for the application in educational, cyber event, training and research.
In cyber exercises, the simulated BESS plays dual roles — both as a red team target system and as a blue team resilience mechanism during cyber incidents. For instance, during a red-team attack scenario that triggers a simulated power outage, the BESS subsystem can automatically supply backup power for a limited duration. This feature allows the blue team to perform real-time incident response , they need to follow the pre-set emergency handling plan to prevent the attack and restore system stability before the stored energy is depleted. Such dynamic interactions help participants understand the operational importance of BESS within modern grid defense and recovery strategies.
--------------------------------------------------------------------------------------------------------------------
Background: Energy Storage Systems (ESS) in the Power Grid
Before delving into the technical design of the simulated BESS, it is important to give a short introduction about the broader concept of Energy Storage Systems (ESS) within real-world power grids. The diagram below from Wikipedia illustrates the fundamental energy flow and key functional roles of ESS.

Figure-02: ESS subsystem structure and function overview, version v0.2.0 (2025)
An Energy Storage System (ESS) is a critical component in modern power grid systems, designed to store excess electrical energy and release it when needed. ESS plays a vital role in balancing supply and demand, improving grid stability, and enabling the integration of renewable energy sources such as solar and wind, which are inherently intermittent.
By storing surplus energy during periods of low demand or high renewable generation, and discharging it during peak demand or supply shortages, ESS enhances the reliability, flexibility, and resilience of the grid. Different technologies are used in ESS, including batteries (lithium-ion, flow batteries, lead-acid), mechanical storage (pumped hydro, flywheels, compressed air), and thermal storage.
Key functions of ESS in the power grid include:
-
Peak Shaving & Load Leveling – Reducing stress on generation and transmission during high-demand periods.
-
Frequency & Voltage Regulation – Providing fast-response services to maintain grid stability.
-
Renewable Integration – Storing excess renewable energy for use during low-generation periods.
-
Backup Power & Resilience – Ensuring reliable supply during outages or emergencies.
As the global energy landscape shifts toward decarbonization and smart grids, ESS has become an enabling technology for microgrids, smart manufacturing, hybrid power systems, and future energy markets.
--------------------------------------------------------------------------------------------------------------------
BESS Architecture Overview
The architecture of the BESS within the Power Grid OT Cyber Range spans the three basic layers of the OT environment, as illustrated below in the system architecture diagram (high light in the rectangles) :

Figure-03: Power Grid OT Cyber Range Architecture, version v0.2.0 (2025)
Level 0 OT Physical Process Field I/O Device Layer
At the physical-world equipment simulation level, the system models several key BESS components, including:
-
Cube battery packs
-
Battery Management System (BMS)
-
Metering unit and electrical safety systems
-
OEM-level connection and control scope
In the simulated configuration, each BESS is positioned adjacent to the energy collection transformer of its associated power source. The BESS shares the same DC-AC/DC-DC step-up transformer as the generators. Functionally, the BESS acts as a direct power consumer when charging and as a power generator when discharging. The modeled DC interface between the battery system and the transformer (within the OEM scope) operates at 48 V DC.
Level 1 OT System Controller LAN
At the OT controller level, the system employs a PLC simulation program that emulates an ABB AC500 PLC, communicating via the IEC 60870-5-104 protocol. This setup allows the simulated controller to function as a flexible Remote Terminal Unit (RTU) within different layers of the automation architecture. The PLC autonomously manages the BESS’s charge/discharge operations based on linked transformer output, collects relevant operational data, and transmits it back to the power grid control HMI through the simulated RTU communication channel.
Level 2 Power Grid Control Center Processing LAN
On the SCADA-HMI side, the system provides a comprehensive visualization and control interface to display the real-time BESS information, enables manual overload and control commands with deferent gauge, indicator control buttons. It also integrates automated safety and protection mechanisms to ensure realistic grid management behavior within the cyber range environment.
Note : In the reference doc, Volvo Penta use CAN_Bus for the metering unit's data exchange, in my implement I temporary use the traditional GOOSE (Generic Object-Oriented Substation Event) metering unit IEC61850 protocol for data transfer and will change to the CAN-Bus in the future.
--------------------------------------------------------------------------------------------------------------------
Physical World Simulation Design
In the Physical World Simulation Program, three Battery Units are deployed within the power grid’s energy generation scope. Each battery unit is connected to a corresponding OEM Scope (Transformer), together forming the Battery Energy Storage System (BESS). These three BESS units respectively represent the three energy storage mechanisms introduced in the Background : Energy Storage Systems (ESS) in the Power Grid section:
-
Renewable energy sources.
-
Conventional thermal power plants.
-
Power station backup systems.
The physical simulation and user interface implementation are integrated within the Power Grid Physical Simulator Module, as shown below:

Figure-04: BESS UI in the Power Grid Cyber Range, version v0.2.0 (2025)
Battery Unit Simulation Parameters
Each battery scope dynamically provides simulated parameters and operational states that are automatically governed by the corresponding OEM scope logic. The displayed and simulated data include:
-
DC Interface State: Indicates the connection status between the battery and OEM scope (Connected / Disconnected).
-
Operation Data : The BESS operation voltage, current and the battery voltage.
-
Battery Charge/Discharge State: Displays the operational mode — Charging, Discharging, or Idle (fully charged).
-
Energy Data: Shows the current stored energy (kWh) and the corresponding charge percentage.
-
Time Information: Provides the estimated time for full charge or full discharge based on the current power flow.
-
Temperature Data: (Under development – to be implemented in Version 2.1)
In real time, the DC interface state, voltage (V), current (A), and capacity information are updated and displayed next to each battery scope on the GUI. To simulate real-world conditions, the power grid module also introduces data fluctuations by adding randomized offsets to the calculated values. For example, when a battery’s energy capacity falls below 10% after extended discharge, the simulated output voltage will fluctuate within 45V–47V DC, reflecting realistic Measurement Unit (MU) reading variations.
BESS Auto-Management Mechanisms
Two layers of automatic management are implemented within the system to ensure both local autonomy and global coordination across the energy storage subsystems.
(a) Individual Auto-Control
Each BESS operates autonomously under local PLC control. It automatically adjusts its charge/discharge behavior according to the connected OEM scope’s operational state and overall grid conditions. For instance:
-
During high solar output (e.g., sunny day 30 kW generation with 21 kW demand), the BESS switches to
Charging Modeto store surplus energy. -
During low generation periods (e.g., cloudy or rainy conditions with only 10 kW solar output), the BESS automatically enters
Discharge Modeto supplement grid power.
(b) Whole-System Auto-Management
While individual BESS units perform local optimization, the HMI performs system-level balancing. Real-time data from all three BESS units are collected by the HMI, which allows operators to manually adjust control logic to maintain system stability, prevent over-charging or over-discharging, and balance the load among all BESS units.
BESS State Visualization and Manual Control
On the Physical Simulation UI, each BESS is visually represented with one of four distinct color-coded states to facilitate rapid status recognition and manual operation.
BESS Battery Charge State

BESS Battery Idle State

BESS Battery Discharge State

BESS Power Link Cut-Off State

Manual Overload Control
To support manual testing and failure simulation, the interface provides control checkboxes that allow the operators to manually disconnect the DC interface between a battery scope and its OEM scope as shown below :

Figure-05: BESS Manual Overload Control on Physical World Simulator, version v0.2.0 (2025)
This feature enables testing of overload scenarios, grid isolation behavior, and BESS response verification under manual override conditions.
--------------------------------------------------------------------------------------------------------------------
BESS Monitor & Control — IEC-104 PLC Design
This section describes the OT-level design for monitoring and controlling the three simulated BESS units. The implementation uses the project Python Virtual PLC Simulator with IEC-60870-5-104 Communication Protocol to build the IEC104-PLC program.
For simplicity the current release runs one IEC104 PLC instance with three memory banks (one bank per BESS). The PLC fetches MU/sensor/field values from the Physical World Simulator, executes local automatic control logic (ladder logic), updates physical components in the simulator, and reports measurements/controls back to the SCADA/HMI via IEC104. The system workflow diagram is shown below :

Figure-06: BESS IEC60870-104 PLC Workflow Diagram, version v0.2.0 (2025)
The system will loop execute the steps in below workflow sequence:
-
Step1 :
Physical Simulatorpublishes battery measurements (voltage, current, SOC, DC link state, temperature). -
Step2 : PLC reads these values from the
Physical Simulatorand set the related input contact IEC-104 IOA memory. -
Step3 : PLC runs the pre-set ladder logic rungs (auto/manual, interlocks, timers, hysteresis) to decide the commands (charge enable, discharge enable, DC breaker open/close, alarms) for next step.
-
Step4 : PLC writes control outputs back to the output coil IOA memory and feed back to the
Physical Simulator. -
Step5 : PLC packages the measurement/control points as IEC104 objects (M_SP_NA_1, M_ME_NC_1, C_RC_TA_1, etc.) and exchanges them with SCADA/HMI.
IEC104 Memory Mapping
Notes:
-
MP= measurement point;CP= command/changeable point. -
Use
M_SP_NA_1for discrete states (Booleans),M_ME_NC_1for measured analog numeric. -
CP type
C_RC_TA_1is used for simple command steps: Auto Mode:c104.Step.INVALID_0, Manual Power OFF :c104.Step.LOWER, Manual Power ON :c104.Step.HIGHER, Changeable Point Type:CP
Solar Plant BESS IEC104 Memory Configure
| Memory Point IOA | Point Type | Memory Point Type | Init Val | Physical Component |
|---|---|---|---|---|
| 01 | MP | c104.Type.M_SP_NA_1 |
False | BESS_0_DC_interface_state |
| 02 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_0_Battery_state |
| 03 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_0_Operation_voltage |
| 04 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_0_Operation_current |
| 05 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_0_Battery_percentage |
| 06 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_0_Battery_temperature |
| -- | -- | -- | -- | -- |
| 11 | CP | c104.Type.C_RC_TA_1 |
c104.Step.INVALID_0 |
BESS_0_DC_interface_breaker |
Oil Plat BESS IEC104 Memory Configure
| Memory Point IOA | Point Type | Memory Point Type | Init Val | Physical Component |
|---|---|---|---|---|
| 21 | MP | c104.Type.M_SP_NA_1 |
False | BESS_1_DC_interface_state |
| 22 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_1_Battery_state |
| 23 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_1_Operation_voltage |
| 24 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_1_Operation_current |
| 25 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_1_Battery_percentage |
| 26 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_1_Battery_temperature |
| -- | -- | -- | -- | -- |
| 31 | CP | c104.Type.C_RC_TA_1 |
c104.Step.INVALID_0 |
BESS_0_DC_interface_breaker |
Station BESS IEC104 Memory Configure
| Memory Point IOA | Point Type | Memory Point Type | Init Val | Physical Component |
|---|---|---|---|---|
| 41 | MP | c104.Type.M_SP_NA_1 |
False | BESS_2_DC_interface_state |
| 42 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_2_Battery_state |
| 43 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_2_Operation_voltage |
| 44 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_2_Operation_current |
| 45 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_2_Battery_percentage |
| 46 | MP | c104.Type.M_ME_NC_1 |
0.00 | BESS_2_Battery_temperature |
| -- | -- | -- | -- | -- |
| 51 | CP | c104.Type.C_RC_TA_1 |
c104.Step.INVALID_0 |
BESS_2_DC_interface_breaker |
Ladder Logic Implement Example
Below are representative ladder rungs for each BESS_1 (Solar Plant BESS) , in the IEC-014 plc simulation, all the ladder logic is simulated via python code.
Rung 1 — Auto / Manual selection
If manual command active, set Auto_Mode = FALSE. Otherwise Auto_Mode = TRUE.
[ HMI_Manual_Mode ] ----( )---- Auto_Mode := FALSE
[ NOT HMI_Manual_Mode ] ---( )---- Auto_Mode := TRUE
Rung 2 — Safety interlock: force breaker OPEN on fault
Condition: overtemp OR overcurrent OR voltage out-of-range → breaker open, disable charge/discharge, set Alarm.
[( T > T_MAX ) OR ( I > I_MAX ) OR ( V < V_MIN ) OR ( V > V_MAX )]--------------------------( )---- Force_Breaker_Open
Rung 3 — Auto charge enable (when Auto_Mode)
Charge if Auto_Mode AND Grid_Surplus AND SOC < CHARGE_ENABLE_TH (e.g., 95%) AND NOT Force_Breaker_Open
[ Auto_Mode ] + [ Grid_Surplus ] + [ SOC < 95 ] + [ NOT Force_Breaker_Open ]-------------------( )---- Charge_Enable
Rung 4 — Auto discharge enable (when Auto_Mode)
Discharge if Auto_Mode AND Grid_Deficit AND SOC > DISCHARGE_ENABLE_TH (e.g., 10%) AND NOT Force_Breaker_Open
[ Auto_Mode ] + [ Grid_Deficit ] + [ SOC > 10 ] + [ NOT Force_Breaker_Open ]-------------------( )---- Discharge_Enable
Rung 5 — Breaker command logic with manual override
Manual commands from HMI (Close/ Open) take precedence; otherwise close breaker if either charge or discharge enabled and no force open.
[ Manual_Close ] ----------------( )---- Breaker_CMD := CLOSE
[ Manual_Open ] -----------------( )---- Breaker_CMD := OPEN
[ NOT Manual_Close ] + [ NOT Manual_Open ] + (Charge_Enable OR Discharge_Enable) + [ NOT Force_Breaker_Open ]---------------------( )---- Breaker_CMD := CLOSE ELSE Breaker_CMD := OPEN
Rung 6 — Alarms latching [under developing]
If any safety condition true, set alarm latch until acknowledged by operator.
[( T > T_MAX ) OR ( I > I_MAX ) OR ( V < V_MIN ) OR ( V > V_MAX )] --------------------------------( )---- Alarm_Latch
[ HMI_Ack ] --------------------------------(R)---- Alarm_Latch RESET
Mapping to other BESS-X the control logic are same:
-
DC_OK=BESS_x_DC_interface_state(bool) -
SOC=BESS_x_Battery_Percentage(%) -
V=BESS_x_Operation_Voltage(V) -
I=BESS_x_Operation_Current(A) -
T=BESS_x_Battery_Temperature(°C) -
Grid_Surplus= computed flag (generation > load + margin) — derived in PLC from grid measurements. -
Grid_Deficit= computed flag (load > generation + margin) -
Auto_Mode= PLC auto/manual link and battery state switcher (true=auto) -
Manual_Open/Manual_Close= HMI command CP to breaker (enum/latch) -
Breaker_CMD= coil that controlsBESS_x_DC_interface_BreakerCP
Safety alarm triggered condition:
-
If
Temperature > T_max→ force DC breaker OPEN, disable charge/discharge, raise alarm. -
If
Voltage < V_minorVoltage > V_maxorCurrent > I_max→ open breaker and alarm.
--------------------------------------------------------------------------------------------------------------------
Battery Energy Storage System (BESS) SCADA HMI Design
The Battery Energy Storage System (BESS) Human-Machine Interface (HMI) serves as a critical component of the Power Grid SCADA System, enabling operators to monitor, control, and manage distributed energy storage units in real time.
The BESS HMI establishes an IEC 60870-5-104 (IEC104) client connection to the dedicated PLC controller. Through this communication channel, the system continuously retrieves live BESS operational data (voltage, current, capacity, and status) and allows secure remote control commands to be sent back to the PLC.
The monitoring and control interface of the BESS is shown below (high light in red rectangles):

Figure-07: BESS Control Panel in Power Grid Cyber Range HMI, version v0.2.0 (2025)
The design integrates five dedicated panels that provide operators with both visualization and interactive control capabilities:
IEC 60617 Circuit Diagram Display Panel
-
Panel Type: Raw BESS Data Monitor
-
Function : Displays the circuit schematic view of the power grid based on IEC 60617 graphical symbols. The panel visualizes BESS icons and real-time parameters (state of charge, voltage, current, and battery percentage) acquired from the IEC104 PLC.
IEC 104 PLC [Storage Control] Panel
-
Panel Type: PLC and Communication Status Monitor
-
Function: Monitors the communication health between the SCADA system and the IEC60870-104 PLC. Displays PLC connection information including IP address, communication port, PLC ID, station index, and connection state.
Power Storage Link Control Panel
-
Panel Type: BESS DC Interface Monitor and Controller
-
Function: Provides manual and automatic control over the DC power link interface between each BESS and the main grid bus. Button
Power-Link[Connect]: Manual control to turn on the DC-interface power link, ButtonPower-Link[Cut-OFF]: Manual control to cut of the on the DC-interface power link, ButtonPower-Link[PW-Manual]: switch between the auto/manual control mode.
IED-MU Detail Data Panel [Energy Capacity]
-
Panel Type: Processed BESS Data Monitor
-
Function: Presents calculation of the remaining battery energy capacity from each storage unit. Operators can observe the real-time charge percentage of each BESS, enabling efficient energy management and performance tracking.
Alert Code Display Panel
-
Panel Type: Fault and Warning Monitor
-
Function: Displays active error and warning codes received from each BESS module, allowing the operator to quickly identify abnormal states and trigger appropriate maintenance or safety actions.
Through IEC 60870-104 communication and structured SCADA panels, operators gain full situational awareness of system performance, communication status, and power link control, ensuring both grid reliability and operational safety.
--------------------------------------------------------------------------------------------------------------------
Conclusion
In summary for the simulated Battery Energy Storage System (BESS) within a Power Grid OT Cyber Range, the work integrating physical process simulation, OT controller logic with IEC-104 PLCs, and a centralized SCADA HMI, the project successfully creates a realistic and manageable replica of BESS operations. While a simplified distillation of real-world complexity, this functional framework provides a vital platform for hands-on training, cybersecurity exercises, and operational research, ultimately enhancing the understanding and resilience of modern power grid infrastructures in a controlled, simulated environment.
Reference Doc Link